Expert Dubai inspection – 500+ checkpoints for handover. Independent inspection of apartments, villas and off-plan properties in Dubai. Detailed defect reporting within 24 hours.
Developers deliver properties in high volume. Hidden defects are common during handover.
Without technical documentation, responsibility for defects may shift to the owner after DLP.
A professional snagging report protects your investment before final acceptance.
What do we check
500+ Inspection Checkpoints Include:
Electrical inspection
Electrical systems and load testing. RCD tests, Lights, and appliances – separate functional check. DB panel inspection
HVAC Inspection
HVAC performance and air flow. Thermal camera – heat anomaly detection. Exhaust fans – airflow and operation check
Plumbing Inspection
Water pressure and drainage slope. Water pressure and drainage slope. Water heaters – functionality and safety check
Floors inspection
Tile alignment and hollow spots. Proper grouting materials & execution. Damage on the tiles reporting
Doors, Windows & Glass
Door alignment and smooth operation. Locking mechanisms and handle stability. Window sealing and air gaps. Double-glazing integrity. Frame fixation and silicone finishing.
Structural & Finishing Elements
Wall alignment and surface leveling. Cracks in plaster or concrete. Paint consistency and finishing defects. Ceiling joints and gypsum board integrity. Silicone sealing and edge finishing.
Moisture & Thermal Inspection
Moisture meter wall scanning. Thermal camera inspection. Heat loss detection
We are confirming your booking and looking forward to meeting you on the site
On-site inspection
We are coming to your property to inspect the condition and to look for the snags. Usually it takes from 2 to 8 hours, depends on the units size
Defects recording
We underline the defects, mark them directly on the property, and include the comments in our report.
Report creation & Submition
We create a report which is listing the noticed comment. This report is used to be submitted to the developer for the rectification
Re-inspection - optional
We re-inspect the issues that we raised during the initial inspection. If any works were not completed or completed not the right way-we re-raise them.
The Defect Liability Period (DLP) in Dubai is a warranty period after property handover during which the developer remains responsible for repairing construction defects.